Allen Road
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street

Cedarvale and Forest Hill Stations Open House
Thank you for attending the open house about Cedarvale and Forest Hill Stations on November 2, 2017.
For those of you who missed it, the presentation is here: Lire la suite »
Overnight Watermain Works on Eglinton Avenue at Allen Road for Cedarvale Station
WHAT WORK IS TAKING PLACE?
- In preparation for the next phase of shoring works at Cedarvale Station, crews need to cap and remove an old watermain that runs under the current Eglinton Avenue westbound lane.
- Crews will be occupying a lane on Eglinton Avenue West from Park Hill Road to Allen Road North (in front of the TTC station) to accommodate this work.
TIMING Lire la suite »
Cedarvale - Forest Hill Construction Liaison Committee Meeting
The construction liaison committee meeting of Cedarvale and Forest Hill stations was held on October 25, 2017. You can see the presentation here:
Early Morning Concrete Pour at Cedarvale Station for Crossover Track Roof Construction
WHAT WORK IS TAKING PLACE?
- With the invert concrete slab now complete at the crossover track section east of Cedarvale Station, the next phase is pouring the roof slab. The roof slab will be poured in sections.
- Due to the large size of these concrete pours, work will start at 4AM in order to complete the pour during the daytime hours, avoiding late overnight work.
- The first pour was successfully completed on October 12.
TIMING Lire la suite »
Allen Road - Short Duration Rolling Lane Reductions - October 27
What Work is Taking Place?
- Crews need to complete surveying activities for centre lines on Allen Road from Eglinton Avenue West to the Aldburn Road Bridge.
- For two hours, one in each direction (north and south), Allen Road will have rolling lane reductions.
Timing Lire la suite »
Eglinton Lane Reduction for Cedarvale Station Utility Work
What Work is Taking Place?
- To accommodate the continued utility works for Cedarvale Station, crews will reduce eastbound Eglinton Avenue from Park Hill Road to Allen Road to one lane to access two maintenance manholes.
Timing
- The lane reduction is scheduled for October 23 – 27 from 10:00 AM to 3:00 PM daily to reduce impact on peak traffic hours.
- Work may be delayed due to weather conditions or unforeseen circumstances.
What to Expect
- Eglinton Avenue will be reduce
Preparing to Realign Allen Road South
PREPARING TO REALIGN ALLEN ROAD SOUTH
In early 2018, the construction work zones and traffic set up will change again for the next phase of support of excavation (shoring) activities on the north side of Eglinton Avenue West at Allen Road.
This requires the Allen Road South off-ramp to be realigned approximately 20m west.
The existing All Road South off-ramp will be in place as-is until early 2018.
What Work is Taking Place? Lire la suite »
Overnight and Early Morning Works at Cedarvale Station for Roof Slab Concrete Pour and Traffic Deck Coating
What Work is Taking Place?
- Next week, two nights of overnight work are required and one early morning concrete pour is planned.
- Minimal noise is expected from both pieces of work.
- Work may be delayed due to weather conditions or unforeseen circumstances.
Traffic Deck Coating
TUESDAY OCTOBER 10 at 7PM – WEDNESDAY OCTOBER 11 at 5AM
WEDNESDAY OCTOBER 11 at 7PM – THURSDAY OCTOBER 12 at 5AM
Cedarvale Station: Overnight Crosswalk Line Painting & Road Decking Inspection - Oct 1 & Oct 2
What Work is Taking Place?
- Two nights of overnight work on Eglinton Avenue West at Allen Road are required.
- Work will be done overnight while traffic volumes are low.
- Minimal noise is expected from both pieces of work.
- Work may be delayed due to weather conditions or unforeseen circumstances.
Crosswalk Line Painting
MIDNIGHT on SUNDAY, OCTOBER 1 until APPROXIMATELY 2AM on MONDAY, OCTOBER 2 Lire la suite »
Cedarvale - Forest Hill Construction Liaison Committee Meeting
The construction liaison committee meeting of Cedarvale and Forest Hill stations was held on September 27, 2017. You can see the presentation here: Lire la suite »