Avenue Station Secondary Entrance Sound Wall

Original Issue Date: July 6, 2017
Re-issue Date: August 10, 2017 

What Work is Happening?

Starting as early as Friday, August 11, work will begin to construct a sound barrier wall at the north side of the secondary entrance. This wall is engineered for maximum sound reduction and will be in place until construction of the station nears completion.

Hours of Work/ What to Expect Lire la suite »

juillet 132017

Overnight Watermain Investigations near Avenue Station

What Work is Happening?

To prepare for upcoming mining works at Avenue Station, a careful inspection of watermains in the area is required. 

Crews will complete water leakage detection for the watermains in the vicinity of the future station box. The scope of work includes testing watermains and associated fittings on Eglinton Avenue West between Avenue Road and Lascelles Blvd. Lire la suite »

juillet 062017

Chaplin - Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on July 5, 2017. You can see the presentation here:

juin 072017

Chaplin - Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on June 6, 2017. You can see the presentation here:

mai 312017

Avenue Station Open House

Thank you for attending our Avenue Station Open House on May 30, 2017.

For those of you who missed it, the presentation is here:

mai 182017

Utilities and Site Service Connections at Avenue Station

Crews will complete works to connect water and sewer services at the main and secondary entrances and designated park area for Avenue Station. Crews are also performing hydro utility works in the designated park area to complete a temporary power connection.  For the safety of the public and workers, temporary pedestrian and traffic changes will be in effect to accommodate this work.  Work will occur in stages to minimize traffic disruptions. Lire la suite »

avril 192017

Dewatering System at Avenue Station

 

Dewatering System at Avenue Station

  Lire la suite »

avril 192017

Line Painting at Avenue Station

 

Line Painting at Avenue Station

  Lire la suite »

mars 312017

LOW WATER PRESSURE NOTICE: Watermain Investigation Work

What Work is Taking Place?

On April 3, 2017, crews will begin subsurface utility engineering (SUE) investigation of a large 900mm watermain in the Eglinton Avenue West and Chaplin Crescent area.  The watermain will be exposed to determine the utility and ground conditions in advance of wet utilities relocation.  Most of the work will take place within the existing traffic staging at Chaplin Crescent and Eglinton Avenue West. Lire la suite »