Mid-block Guideway and Stop Construction from Victoria Park Avenue to Ionview Road

 

What Work is Taking Place

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting mid-block guideway and stop construction between Victoria Park Avenue and Ionview Road, for approximately eight (8) months through spring 2020. 

Guideway and stop construction includes: cutting and removal of asphalt, excavation, installation of subgrade materials, duct banks installation, track drainage, track slab and stop construction. Lire la suite »

novembre 082019

Mid-Block Guideway Work at the East of Birchmount Road

 

What Work is Taking Place?

On Sunday November 3, 2019, Rosemount Drive will be closed north of Eglinton Avenue East for approximately six (6) weeks to facilitate guideway construction for the future Eglinton Crosstown LRT surface stops.  Guideway construction includes, cutting and removal of asphalt, excavation, installation of subgrade materials, duct banks installation and track drainage, track slab and stops. Lire la suite »

novembre 072019

Permanent Removal of Left Turn Lanes on Eglinton Avenue East at Birchmount Road

 

What Work is Taking Place?

In order to accommodate the future Birchmount Stop construction,  the  left turn lanes on Eglinton Avenue East at Birchmount Road will be  removed.

The westbound left turn lane on Eglinton Avenue East at Birchmount Road will be removed as early as November 13, 2019. 

The eastbound left turn lane on Eglinton Avenue East at Birchmount Road will be removed as early as December 9, 2019. Lire la suite »

octobre 252019

Eastern Works Open House

Thank you for attending the Easterm Works Open House on October 24, 2019. For those of you who missed it, the presentation is here:

 

 

octobre 172019

Upcoming Driveway Closures between Birchmount Road and Rosemount Drive

Starting October 23, 2019, a series of temporary driveway closures will be in effect between Birchmount Road and Rosemount Drive to facilitate pavement reconstruction and road widening of Eglinton Avenue East, as part of the construction of Birchmount Stop. Eglinton-facing driveways at the following locations will be closed for approximately three (3) weeks while the work takes place:

835 Birchmount Road Lire la suite »

octobre 172019

UPDATED: Guideway Excavation at Rosemount Drive Intersection

Original Post: October 10, 2019

UPDATED: October 17, 2019

 

What Work is Taking Place?

As part of the ongoing works at intersections along Eglinton Avenue East in support of the future surface stops, crews will be conducting guideway excavation at the Rosemount Drive intersection.  Lire la suite »

octobre 082019

Guideway Excavation from Birchmount Road to Rosemount Drive

 

What Work is Taking Place?

As part of the ongoing pavement reconstruction works along Eglinton Avenue East in support of construction of the future surface stops, crews will continue with guideway excavation from Birchmount Road to Rosemount Drive.

As early as October 9th, 2019 the construction zone will shift to the center of Eglinton Avenue East between Birchmount Road to Rosemount Drive and be in place for approximately four (4) weeks.  Lire la suite »

octobre 022019

Update: Driveway Closure at 2296 Eglinton Avenue East

 

What Work is Taking Place?

As part of the ongoing works to build the LRT system along Eglinton Avenue East, crews will continue work with stage 2 at Massey Creek. The western driveway at 2296 Eglinton Avenue East will be closed as early as October 2nd and last for one (1) week. The eastern driver at 2300 Eglinton Avenue property will remained closed for four (4) months. The closures are required to carry out the construction works in a safe and prompt manner.  Lire la suite »

septembre 272019

Pedestrian Walkway and Sidewalk Closures at Birchmount Road to Rosemount Road

 

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting curb and pedestrian walkway work on the south side of Eglinton Avenue East between Birchmount Road and Rosemount Road. Starting as early as Wednesday, October 2nd 2019, and lasting approximately three (3) weeks access to the main walkway of 2225 and 2239 Eglinton Avenue East will be temporarily restricted. Property access to the buildings will be maintained on either side of the property.  Lire la suite »

septembre 252019

Pharmacy to Kennedy Construction Liaison Committee Meeting

The construction liaison committee meeting of Pharmacy to Kennedy was held on September 24, 2019. You can see the presentation here:

 