What's New?
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street
Enbridge Gas Distribution Line Relocation Victoria Park Avenue & Eglinton Avenue East
What Work is Taking Place?
Enbridge Gas Distribution (Enbridge) is relocating a gas main in the Eglinton Crosstown LRT corridor on Eglinton Avenue East between Victoria Park Avenue and Saddle Ridge Drive.
Timing
- Work will start at the end of June 2017 and will last for approximately four weeks.
- Work will occur between 7:00 a.m. and 5:30 p.m., Monday to Friday.
- Work could be rescheduled due to weather conditions or any unforeseen circumstances.
UPDATE: Cedarvale Station Support of Excavation
Original issue date: March 14, 2017
Re-issue date: June 9, 2017
UPDATE: Cedarvale Station Support of Excavation
By the end of 2015, tunneling works in the vicinity of Allen Road had concluded. Throughout 2016 and the beginning of 2017, crews conducted preparatory works for the future Cedarvale Station construction. Lire la suite »
Preparatory Road Works on Eglinton Avenue East for Surface Stops
Preparatory Road Works on Eglinton Avenue East for Surface Stops
The surface section of the Eglinton Crosstown LRT will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. To prepare for the construction of the surface section, crews are working to get the roadway ready.
Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located. Lire la suite »
Drill Move at Mount Pleasant Station
What Work is Taking Place?
On Thursday May 25, crews will move the drill rig located at the Main Entrance east to the Secondary Entrance. The drill rig will exit the Main Entrance and travel in reverse along Eglinton Avenue East, crossing Mt. Pleasant Road, over to the Secondary Entrance. Additionally, a crane will lift equipment onto a truck to be transported to the Secondary Entrance.
Timing Lire la suite »
Drill Move at Mount Pleasant Station
What Work is Taking Place?
On Thursday May 25, crews will move the drill rig located at the Main Entrance east to the Secondary Entrance. The drill rig will exit the Main Entrance and travel in reverse along Eglinton Avenue East, crossing Mt. Pleasant Road, over to the Secondary Entrance. Additionally, a crane will lift equipment onto a truck to be transported to the Secondary Entrance.
Timing Lire la suite »
Upcoming Hydro Utility Relocation around Mount Pleasant Station
What Work is Taking Place?
To prepare for the construction of Mount Pleasant Station, crews will relocate and upgrade existing overhead hydro utilities in the vicinity of Mount Pleasant Road and Eglinton Avenue East for approximately eight weeks. Lire la suite »
Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017
What Work is Taking Place?
As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Brentcliffe Road and Midland Avenue. Lire la suite »
Ongoing Clearing, Grubbing and Pruning between Don Avon Drive and Rosemount Drivein Preparation for Construction of Surface Stops
What work is Taking Place? Lire la suite »
Upcoming Support of Excavation and Utility Relocations in the Roadway at Mount Pleasant Station
In Fall 2016, crews started support of excavation (shoring) works at both the Main and Secondary Entrance sites of the future Mount Pleasant Station. The next step is to begin utility relocations and shoring of the station box in the roadway. Crews will complete work on the north side of Eglinton Avenue East first, then flip to the south side. Lire la suite »