Kennedy Road
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street

Enbridge Gas Distribution Line Relocation near Kennedy Station
What Work is Taking Place?
To accommodate the construction of the Eglinton Crosstown LRT, Enbridge Gas Distribution (Enbridge) is required to relocate a gas line on Eglinton Avenue East (between Kennedy Road and Midland Avenue) and on Kennedy Road (between Treverton Drive and Eglinton Avenue East).
These pipelines are integral to Enbridge’s gas system and must be re-routed to ensure the safe and reliable delivery of natural gas to customers in the Greater Toronto Area. Lire la suite »
Pharmacy - Kennedy Construction Liaison Committee Meeting
The construction liaison committee meeting of stops and station between Pharmacy and Kennedy was held on May 30, 2017. You can see the presentation here:
Ongoing Clearing, Grubbing and Pruning between Don Avon Drive and Rosemount Drivein Preparation for Construction of Surface Stops
What work is Taking Place? Lire la suite »
Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017
What Work is Taking Place?
As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Brentcliffe Road and Midland Avenue. Lire la suite »
NOTICE OF UPCOMING PARKING CHANGES AT KENNEDY STATION PHASE 1 AS EARLY AS MAY 2017
Kennedy Station will be the terminal station at the eastern end of the Eglinton Crosstown LRT line. Kennedy Station is yet another station along the LRT line to serve as a Mobility Hub, with connections to the GO Transit Stouffville Line, the TTC Scarborough RT, the TTC Bloor-Danforth subway, and the TTC bus terminal.
What Work is Taking Place? Lire la suite »
Surface Section and Kennedy Station Open House
Thank you for attending our Surface Section and Kennedy Station Open House on April 5, 2017.
For those of you who missed it, the presentation is here:
Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017
What Work is Taking Place? Lire la suite »
Upcoming Parking Changes at Kennedy Station - Beginning As Early As Spring 2017
Overview
Kennedy Station will be the terminal station at the eastern end of the Eglinton Crosstown LRT line. Kennedy Station is an interchange station with connections to the GO Transit Stouffville Line, the TTC Scarborough RT, the TTC Bloor-Danforth subway, and a TTC bus terminal. Lire la suite »
Update: Geotechnical Works continue at Kennedy Station
What Work is Taking Place?
- Crews will be conducting ongoing preparatory work that requires short-term temporary work zones along Eglinton Avenue East, Kennedy Road, Transway Crescent, and the North and South Service Roads.
- Crews will drill boreholes in the roadway and boulevards to determine the existing condition of asphalt, soil and rocks.
Timing Lire la suite »