Leslie Street

À la recherche de nouvelles concernant des travaux près d’une i

Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.

Syndiquer le contenu
 
mai 102017

Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017

What Work is Taking Place?

As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Brentcliffe Road and Midland Avenue. Lire la suite »

janvier 182017

Ongoing Occasional Evening Works: Eglinton Lane Reductions between Brentcliffe Road and Leslie Street

What Work is Taking Place?

Beginning as early as late January 2017, crews will conduct geotechnical monitoring on Eglinton Avenue East between Brentcliffe Road and Leslie Street to support construction of the Laird and Science Centre Stations. 

Map shows work zone will occupy area of the Eglinton roadway

Timing Lire la suite »

décembre 122016

Overnight CCTV Investigations along Eglinton Avenue East

What Work is Taking Place?

Crews will be conducting CCTV investigations of the storm and sanitary sewer lines along Eglinton Avenue East. Crews will access all manholes in the roadway along Eglinton Avenue East between Midland Avenue and Laird Drive, along Transway Crescent at Kennedy Station and from approximately 50-100 meters north at all intersections to determine the condition of existing storm and sanitary lines. 

Hours of Work Lire la suite »

novembre 242016

Overnight Geotechnical Works: Dec. 1 & 2 Eglinton Lane Reduction to a Single Lane between Brentcliffe Road and Leslie Street

What Work is Taking Place?

Overnight lane reduction to a single lane of traffic on Eglinton Avenue East between Brentcliffe Road and Leslie Street will be required for two nights, as crews drill boreholes in the road to determine the condition of existing soil and rocks in the area. Boreholes will be drilled along Eglinton Avenue East between Brentcliffe Road and Leslie Street in advance of the construction of Laird and Science Centre Stations. Lire la suite »

novembre 162016

Update: Hydro Utility Relocations for Science Centre Station: Pedestrian Crosswalk Closure and TTC Bus Detour

What Work is Taking Place?

In mid-November crews began to set-up work zones within the roadway at both the northwest and southwest corners of Don Mills Road and Eglinton Avenue East as crews continue to relocate existing utilities at the intersection. Work began on relocating hydro utilities and work continues on relocating telecommunication lines within man holes as well within pre-existing duct banks in preparation for station construction.  Lire la suite »