octobre 22 2018

UPDATE Special Pile Installation at Chaplin Station

WHAT WORK IS TAKING PLACE?

On Monday October 22, crews will implement new traffic staging at Chaplin Station in order to perform sanitary sewer connection works on the south side of Eglinton Avenue West.  During this traffic stage, the southeast sidewalk will be closed between Chaplin Crescent and Russell Hill Road, and pedestrians will be rerouted south of Eglinton Avenue through the laneway.  Lire la suite »

octobre 17 2018

Traffic Changes at Chaplin Station

Traffic Changes at Chaplin Station

 

What Work is Taking Place?

As early as October 20, crews will implement new traffic staging at Chaplin Station in order to perform sanitary sewer connection works on the south side of Eglinton Avenue West.  Upon completion of this work, traffic will return to current conditions.

Upcoming Construction Staging Lire la suite »

octobre 15 2018

Traffic Changes at Don Mills and Eglinton for Science Centre Station

ORIGINAL POST: OCTOBER 5, 2018

Upcoming Traffic Changes at Don Mills and Eglinton

What Work is Taking Place? Lire la suite »

octobre 12 2018

Watermain Lining Work Avenue Station

UPDATE: WATERMAIN LINING & TEMPORARY WATER SERVICE

AVENUE STATION SECONDARY ENTRANCE

 

 

WHAT WORK IS TAKING PLACE? Lire la suite »

octobre 12 2018

Construction Notice - Additional Monitoring Wells at Avenue Station

DATE: Additional Monitoring Wells at Avenue Station

 

WHAT WORK IS TAKING PLACE?

 

Over the next two weeks, crews will work to install additional monitoring wells required for Avenue Station, east of the Secondary Entrance. The wells will be installed in the area around Eglinton Avenue W and Oriole Parkway. These wells support the ongoing monitoring instruments installations required during the construction of Avenue Station. Lire la suite »

octobre 10 2018

NEW DATES: Road Resurfacing and Fresh Line Painting Work - Bessborough Drive to Hanna Road - (Overnight Lane Reductions)

PREVIOUSLY POSTED: SEPTEMBER 24, 2018

What Work is Taking Place?         

On October 12, 13 and 14, Eglinton Avenue East will be reduced to one lane, with two-way traffic facilitated by traffic control personnel between Hanna Road and Bessborough Drive. Lire la suite »

octobre 05 2018

Overnight Line Re-Painting at Leaside Station

Overnight Line Re-Painting at Leaside Station

WHAT WORK IS TAKING PLACE? Lire la suite »

septembre 24 2018

NEW DATE: Overnight Traffic Set-Up at Leaside Station - REVISED

ORIGINAL POSTING: SEPTEMBER 18, 2018

REVISED POSTING WITH NEW DATE

What Work is Taking Place?    Lire la suite »

septembre 24 2018

UPDATE: Traffic and Pedestrian Changes - Leaside Station

ORIGINAL POST: SEPTEMBER 18, 2018

REVISED POSTING WITH NEW DATES

Over October 1 and 2, the traffic conditions at Bayview Avenue and Eglinton Avenue East will change. Please review the changes to lane configurations and turn restrictions on the map below. Lire la suite »

septembre 21 2018

Driveway Closure on Eglinton Ave West and Alternative Parking

564 EGLINTON AVE W DRIVEWAY CLOSURE AND ALTERNATIVE PARKING

 

What work is taking place? Lire la suite »