octobre 12 2017

Early Morning Equipment Move and Deliveries at Chaplin Station

What Work is Taking Place?

On Friday October 13, crews will move heavy equipment from the southwest work zone eastward along Eglinton Avenue to the southeast work zone.

On Tuesday October 17, crews will receive a large delivery of steel beams to be hoisted from Eglinton Avenue into the work zone.  Lire la suite »

octobre 10 2017

Mining at Avenue Station

Mining is expected to begin in November 2017, and will carry on through to late 2019.

What Work is Happening?

The Eglinton Crosstown includes a 10-kilometre underground portion, between Weston Road and Laird Drive, where 15 below-grade stations are under construction. Eleven will be built using a “cut-and cover” method and four, including Avenue Station, are going to be “mined.” 

Excavation of the entrances at Avenue Station is nearing completion and mining will begin soon. Lire la suite »

octobre 06 2017

Overnight and Early Morning Works at Cedarvale Station for Roof Slab Concrete Pour and Traffic Deck Coating

What Work is Taking Place?

 

  • Next week, two nights of overnight work are required and one early morning concrete pour is planned.
  • Minimal noise is expected from both pieces of work.
  • Work may be delayed due to weather conditions or unforeseen circumstances.

 

Traffic Deck Coating

TUESDAY OCTOBER 10 at 7PM – WEDNESDAY OCTOBER 11 at 5AM

WEDNESDAY OCTOBER 11 at 7PM – THURSDAY OCTOBER 12 at 5AM

  Lire la suite »

octobre 06 2017

Overnight Work and Lane Reductions to Install Centre Line Dewatering Wells on Eglinton for Avenue Station

Updated: October 6, 2017
Original Post: October 3, 2017

New Start Date: October 16, 2017 

 

What Work is Taking Place?

The term “dewatering” means pumping water from the ground at a site where there will be excavation and is essential before and during upcoming mining operations at Avenue Station. The dewatering system is installed in two phases, drilling of the wells and then digging shallow trenches to connect the wells and lay the pipes, pumps, and valves for the system. Lire la suite »

octobre 02 2017

Update: Mining at Laird Station Main Entrance

Original Issue Date: September 19, 2017

Re-issue Dates: October 2, 2017  Lire la suite »

septembre 29 2017

Cedarvale Station: Overnight Crosswalk Line Painting & Road Decking Inspection - Oct 1 & Oct 2

What Work is Taking Place?

  • Two nights of overnight work on Eglinton Avenue West at Allen Road are required.
  • Work will be done overnight while traffic volumes are low.
  • Minimal noise is expected from both pieces of work.
  • Work may be delayed due to weather conditions or unforeseen circumstances.

 

Crosswalk Line Painting

MIDNIGHT on SUNDAY, OCTOBER 1 until APPROXIMATELY 2AM on MONDAY, OCTOBER 2 Lire la suite »

septembre 28 2017

Tunnel Concrete Pour for Avenue Station

What Work is Happening? 

To prepare for upcoming mining works at Avenue Station, crews need to fill portions of the completed tunnels with concrete. 

Hours of Work Lire la suite »

septembre 28 2017

UPDATED: Ongoing Preparatory Works between Leslie and Midland: Street Furniture Removals

Updated: September 28, 2017
Original Issue Date: May 10, 2017

What Work is Taking Place? 

As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Leslie Street and Midland Avenue. Lire la suite »

septembre 22 2017
septembre 20 2017

Preliminary Notice to Businesses and Residents: Upcoming Power Outage Between Birchmount and Kennedy

What Work is Taking Place?

Since June 2017, crews have been upgrading and relocating existing hydro utilities in the area located just west of Birchmount Road to Kennedy Road in the vicinity of Eglinton Avenue East. To complete this work, a Hydro outage is required.

Hours of Work Lire la suite »