novembre 06 2017

Installation of Temporary Traffic Signals Across Eglinton Avenue East Between Leslie Street and Kennedy Road

Updated: November 6, 2017

Original Post: October 20, 2017

What Work is Taking Place?

Crews will remove existing traffic signals and install temporary traffic signals on Eglinton Avenue East between Leslie Street and Kennedy Road, to make way for the construction of future surface stops for the Eglinton Crosstown LRT.

Timing Lire la suite »

novembre 03 2017

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

The construction liaison committee meeting of Brentcliffe - Victoria Park was held on November 2, 2017. You can see the presentation here:

Lire la suite »

novembre 03 2017
novembre 03 2017

Sanitary Sewer Installation and Overnight Diversion Work at Chaplin Station

WHAT WORK IS TAKING PLACE?

Part of the work to be done within the north side work zone includes the installation of a new sanitary sewer system. The new sanitary sewer will run along Eglinton Avenue West between Chaplin Crescent and Latimer Avenue.  

To complete the installation of the new sewer, crews will need to divert the existing sanitary sewer system flow. Diversion work involves cutting into the existing sanitary sewer pipe and temporarily diverting the flow of sewage while the new pipes and property connections are installed. Lire la suite »

novembre 02 2017

Overnight Watermain Works on Eglinton Avenue at Allen Road for Cedarvale Station

WHAT WORK IS TAKING PLACE?

  • In preparation for the next phase of shoring works at Cedarvale Station, crews need to cap and remove an old watermain that runs under the current Eglinton Avenue westbound lane.
  • Crews will be occupying a lane on Eglinton Avenue West from Park Hill Road to Allen Road North (in front of the TTC station) to accommodate this work.

TIMING Lire la suite »

novembre 01 2017

Changes to the Driveways at 2360 Eglinton Avenue East: Stage 1

In Support of Upgrades to Water Infrastructure for the Eastern End of the Eglinton Crosstown LRT Line

Beginning as early as Monday, November 6, 2017 for approximately four (4) weeks, driveways at 2360 Eglinton Avenue East will be modified to support construction of the Crosstown LRT. Work will be done in two stages, each stage lasting approximately two (2) weeks.

Please see image below showing changes to access to 2360 Eglinton Avenue East during Stage 1 of this work.

What Work is Taking Place? Lire la suite »

octobre 27 2017

Sanitary Sewer Work at Forest Hill Station

What Work is Taking Place?

Beginning as early as Saturday October 28, crews will be working in the vicinity of Eglinton Avenue West at Hilltop and Chiltern Hill Roads to address a blockage in the sanitary sewer system. 

Eglinton Avenue West will be reduced to one lane in each direction while this work takes place. Road closures of Chiltern Hill Road and Hilltop Road at Eglinton Avenue may be required.  Additional rolling lane closures may be required.

Hours of Work

  Lire la suite »

octobre 25 2017

Avenue Station Construction Updates - October 25

CONSTRUCTION ACTIVITIES AT AVENUE ROAD

Construction activities outside the long-term set up continues to be active as we prepare for upcoming mining operations. These activities are happening during the daytime and nighttime, and overlap. Residents and businesses can expect to see the following daytime and nighttime work at various locations in the roadway or on the sidewalk.

THIS WEEK AT AVENUE STATION: Lire la suite »

octobre 24 2017

Traffic Change at Latimer & Eglinton for Chaplin Station Construction

What Work is Taking Place?

Since spring 2016, crews have been performing utilities relocation and support of excavation (shoring) in the vicinity of Chaplin Crescent and Eglinton Avenue West.  

As early as October 28, 2017, the work zone configuration will change in order to begin shoring and utility work (hydro, sewer) on the north side of Eglinton, while work continues on the south side of Eglinton.  Lire la suite »

octobre 24 2017

Early Morning Concrete Pour at Cedarvale Station for Crossover Track Roof Construction

WHAT WORK IS TAKING PLACE?

  • With the invert concrete slab now complete at the crossover track section east of Cedarvale Station, the next phase is pouring the roof slab. The roof slab will be poured in sections. 
  • Due to the large size of these concrete pours, work will start at 4AM in order to complete the pour during the daytime hours, avoiding late overnight work. 
  • The first pour was successfully completed on October 12.

TIMING Lire la suite »