Overnight and Early Morning Works at Cedarvale Station for Roof Slab Concrete Pour and Traffic Deck Coating
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
Choisissez une intersection (D'Ouest en Est)
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
Choisissez une intersection a à z
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street
octobre 6, 2017
What Work is Taking Place?
- Next week, two nights of overnight work are required and one early morning concrete pour is planned.
- Minimal noise is expected from both pieces of work.
- Work may be delayed due to weather conditions or unforeseen circumstances.
Traffic Deck Coating
TUESDAY OCTOBER 10 at 7PM – WEDNESDAY OCTOBER 11 at 5AM
WEDNESDAY OCTOBER 11 at 7PM – THURSDAY OCTOBER 12 at 5AM
- Based on the inspection work done on October 2, crews require the traffic road decking on Eglinton near the Allen Road South to be recoated.
- Crews will reduce eastbound Eglinton Avenue from Park Hill Road to Allen Road to apply a new coating to the existing traffic deck.
- Work will be done overnight while traffic volumes are low.
Roof Slab Concrete Pour
THURSDAY OCTOBER 12 at 4AM
Rain Dates: October 13, October 16
- With the invert concrete slab now complete at the crossover track section east of Cedarvale Station, the next phase is pouring the roof slab. The roof slab will be poured in three large sections, similar to the invert slab.
- Trucks will access the tunnel shaft from east of Allen Road and pump concrete into a pipe before it is poured into place.
Noise Mitigation Efforts
- White noise/broadband back-up alarms on all equipment/trucks. Broadband back-up alarms, unlike traditional truck back-up alarms, are only heard within the hazard area.