Road Widening and Reconstruction Eglinton Avenue East at Brentcliffe Road – South Side
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street
ORIGINAL POST: MAY 8, 2020
UPDATED: JUNE 11, 2020
Road Widening and Reconstruction
Eglinton Avenue East at Brentcliffe Road – South Side
WHAT WORK IS TAKING PLACE?
As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be performing road widening and reconstruction activities on the south side of Eglinton Avenue East between Brentcliffe Road and the West Don River Bridge. Activities include road widening, curb and sidewalk construction, wet utility relocations and electrical works. Work will take place early May through to early July 2020.
HOURS OF WORK
- Road works on the south side of Eglinton Avenue East will continue through to early July 2020.
- Work may occur from 7:00 a.m. to 8:00 p.m., Monday through Saturday.
- The contractor may not always work during the permitted hours but may do so at its discretion.
- Work may be rescheduled due to weather conditions or unforeseen circumstances.
WHAT TO EXPECT
- Crews will be widening and reconstructing the south side of Eglinton Avenue, east of Brentcliffe Road.
- Crews will be relocating wet utilities, reconstructing curbs and sidewalks and completing electrical works for street lighting.
- Construction activities include:
- Concrete removal
- Excavation
- Concrete works
- Backfill
- Compaction
- Paving
- Streetlight installation
- Noise and vibration from construction equipment and vehicles can be expected.
- Site lighting may be required.
- In addition to construction activity, residents can expect to see equipment and material storage within designated work zones.
TRAFFIC, PEDESTRIAN AND TTC DETAILS
- There will be no impacts to the existing traffic configuration.
- The east crosswalk at the Brentcliffe Road and Eglinton Ave East intersection will remain closed.
- The pedestrian walkway on the south side of Eglinton Avenue East will remain available for the duration of these works.
- No changes to existing TTC stop locations.
Travelling Smart during Construction
Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.
Stay Informed
Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor