Stormline Inspection and Fire Hydrant Testing at Emergency Exit Building 3 (EEB3)
À la recherche de nouvelles concernant des travaux près d’une i
Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.
- Black Creek Drive
- Keele Street
- Caledonia Road
- Dufferin Street
- Oakwood Avenue
- Allen Road
- Bathurst Avenue
- Chaplin Crescent
- Avenue Road
- Yonge Street
- Mount Pleasant Road
- Bayview Avenue
- Donlea Drive/Hanna Road
- Laird Drive
- Leslie Street
- Don Mills Road
- Ferrand Drive
- Wynford Drive
- Bermondsey Road
- Victoria Park Avenue
- Pharmacy Avenue
- Lebovic Avenue
- Warden Avenue
- Birchmount Road
- Ionview Road
- Kennedy Road
- Little Blvd.
- Petman Avenue
- Brentcliffe Road
- Allen Road
- Avenue Road
- Bathurst Avenue
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Lebovic Avenue
- Leslie Street
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Wynford Drive
- Warden Avenue
- Yonge Street
STORMLINE INSPECTION AND FIRE HYDRANT TESTING AT EMERGENCY EXIT 3
(Eglinton Avenue East and Donlea Drive)
March 31, 2020
WHAT WORK IS TAKING PLACE?
Storm line inspection and testing of the new fire hydrant will take place on Eglinton Avenue East at Donlea Drive on March 31, 2020. Inspection and testing will take place beginning at 9:00 a.m. for a period of approximately four (4) hours. To safely perform these activities, a temporary closure of one westbound lane on Eglinton Avenue East will be implemented (depicted below), there will be no vehicular access between Eglinton Avenue East and Donlea Drive for the duration of these activities.
WORK AREA MAP
HOURS OF WORK
- Work is expected to take place on March 31, 2020 between the hours of 9:00a.m. and 1:00p.m.
- Inspections and testing may be longer or shorter than expected.
- The contractor may not always work during the permitted hours but may do so at its discretion.
- This traffic change and related construction activities may be delayed or rescheduled due to inclement weather or unforeseen circumstances.
WHAT TO EXPECT
- Crews will be inspecting the inside of the new stormline by inserting a CCTV camera through the manhole located at Eglinton Avenue East and Donlea Drive.
- Crews will also be performing a fire hydrant flow test on the newly installed fire hydrant within the work zone.
TRAFFIC IMPACTS
- Temporary closure of one westbound lane on Eglinton Avenue East at Donlea Drive.
- No vehicular access between Eglinton Avenue East and Donlea Drive for the duration of the work.
PEDESTRIAN IMPACTS
- Pedestrians will be rerouted around the work zone on Donlea Drive on the north side of Eglinton Avenue East.
TRANSIT INFORMATION
- No impacts to existing TTC stops and routes.
TRAVELLING SMART DURING CONSTRUCTION
- Travel delays are expected with construction. Please allow extra time for your journey.
- Traffic will be extra heavy at peak periods during the Eglinton Crosstown LRT construction.
STAY INFORMED
- Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real time traffic and transit information for the Eglinton corridor
- Download the free ‘aCrosstown’ traffic app to get real-time traffic and transit information for Eglinton Avenue.