Traffic Signal Reconfiguration at Mount Pleasant Station Saturday January 18 and Sunday January 19

À la recherche de nouvelles concernant des travaux près d’une i

Choisissez une intersection dans le menu déroulant ci-dessous pour obtenir tous les renseignements et dernières nouvelles sur la construction dans cette zone. Les intersections sont indiquées d’ouest en est, Eglinton étant la principale rue perpendiculaire.

 
janvier 15, 2020

 

Traffic Signal Reconfiguration at Mount Pleasant Station

Saturday January 18 and Sunday January 19


What Work is Taking Place?

On Saturday January 18 and Sunday January 19, crews will work over the weekend to reconfigure the traffic signals at Eglinton Avenue East and Mount Pleasant Road. This work requires intermittent lane closures. When required, Eglinton Avenue East and Mount Pleasant Road will be reduced to one lane only at the intersection, alternating traffic in each direction. Work will take place between 7 a.m. – 5 p.m. Traffic control personnel and/or a paid duty officer will be present while this work takes place.

Hours of Work

 

  • Saturday January 18 and Sunday January 19 
  • 7:00 a.m. – 5:00 p.m.
  • Work may be delayed or rescheduled due to inclement weather or unforeseen circumstances.

 

Work Area Map

What to Expect

  • Expect delays while travelling through the intersection.
  • Construction vehicles will occupy one laneway at a time on Eglinton Avenue East and Mount Pleasant Road.

Traffic and Pedestrian Changes

 

  • Eglinton Avenue East and Mount Pleasant Road will be reduced to one lane only at the intersection, alternating traffic in each direction.
  • Traffic control personnel and/or a paid duty officer will be present while this work takes place.
  • All pedestrian routes will remain the same. 

 

Transit Information

 

  • Access to TTC will be maintained at all times.
  • Visit www.ttc.ca for more information

 

Travelling Smart during Construction

Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.

Stay Informed

Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.

Disponible en français

Thank you for your continued patience as we work to build this important project.

Please support your local businesses during construction.