Construction Notice: Lane Closure for Bypass System Maintenance at Forest Hill Station (January 15, 2020)

 
janvier 14, 2020

 

On Wednesday, January 15, Hilltop Road will be reduced to one shared lane between Eglinton Avenue and the Green P lot entrance while crews perform maintenance on the sewer bypass.  Traffic control personnel will be present for the duration of the work.  Once the maintenance is complete, one lane in each direction will be restored.

Hours of Work

 Wednesday January 15, 2020 beginning at 9:00 a.m. for approximately six (6) hours

 In the event of inclement weather, this work may be rescheduled

Work Area Map

Lane Closure for Bypass System Maintenance at Forest Hill Station

What to Expect

  • Noise from construction activity, such as a hydro-vacuum truck, can be expected 

Traffic Details

  • Hilltop Rd will be reduced to one shared lane between Eglinton Ave and the Green P lot entrance, alternating traffic in each direction
  • Traffic control personnel will be present for the duration of the lane closure
  • Access to the Hilltop-Bathurst laneway and Green P lot will be maintained
  • Motorists can expect delays when travelling near the work zone

Pedestrian Details

  • For safety, pedestrians may be rerouted around the work zone

Travelling Smart during Construction

Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.

Stay Informed

Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.

 

Disponible en français

Thank you for your continued patience as we work to build this important project.
Please support your local businesses during construction.