Lane Reductions at Dufferin (Fairbank Station) May 11 & 12, 2020

 
mai 8, 2020

 

What Work is Taking Place?

On Monday May 11 and Tuesday May 12, crews at Fairbank will removing the queen piles in the middle of the station box and Eglinton Avenue West. To complete this work, the westbound lane on Eglinton Ave W, west of Dufferin St, will be closed. One lane on Eglinton Avenue W will remain open, and two-way traffic will be controlled by traffic control personnel and Paid Duty Officers. The lanes will be reduced from as early as 10:00am – 2:00pm.

 Hours of Work

  • Monday May 11 and Tuesday May 12, 2020
  • The lanes will be reduced from as early as 10:00am – 2:00pm.
  • The contractor may not always work during the permitted hours but may do so at its discretion.
  • Work may be rescheduled due to weather conditions or unforeseen circumstances.
  • This work may be longer or shorter than expected.

 What to Expect

Work Area Map

Lane Closures May 2020

 

Traffic Details

  • The westbound lane on Eglinton Ave W will be temporarily closed.
  • In addition to construction activity, residents can expect to see equipment and material storage within designated work zones.
  • Travel delays are expected with construction. Please allow extra time for your journey.

Pedistrian Details

 

 

Travelling Smart During Construction

Travel delays are expected with Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during Crosstown construction. When possible, please travel during the off-peak period between 10:00 a.m. and 3:00 p.m.

 Stay Informed

Sign up for email updates at www.thecrosstown.ca/sign-up or download the aCrosstown traffic app to get real-time traffic and transit information for the Eglinton Corridor.

Disponible en français