Road Milling Works - Eglinton Avenue East between Swift Drive and Victoria Park Avenue

Road Milling Works - Eglinton Avenue East between Swift Drive and Victoria Park Avenue

Monday, August 16 to Friday, August 20, 2021

What Work is Taking Place?

April 282021

Overnight OCS Cable Installations on Eglinton Avenue East between Don Mills Road and Sloane Avenue

Original Post: April 23, 2021

Updated: April 28, 2021 

Overnight OCS Cable Installations on Eglinton Avenue East between Don Mills Road and Sloane Avenue

WHAT WORK IS TAKING PLACE? Read more »

February 262021

Overnight OCS Cable Installation on Eglinton Ave at Laird, Leslie, Sloane & Kennedy. March 1 - April 2

 

What Work is Taking Place?

Crews will be installing OCS (Overhead Catenary System) cables along Eglinton avenue east between Laird drive, Leslie street, Swift drive, Sloane avenue, and Kennedy road. Overhead catenary is the system installed overtop of the rails of a light rail system, to provide operational power to the LRVs (Light Rail Vehicles). Read more »

January 112021

Overnight OCS Cable Installation on Eglinton Ave at Don Way, Swift Dr/Credit Union Dr, Sloane Av/Bermondsey Rd

What Work is Taking Place?

Crews will be installing OCS (Overhead Catenary System) cables along Eglinton Avenue East between Don Way (NE ramp, S-WN ramp), Swift Dr/Credit Union Dr, and Sloane Ave/Bermondsey Dr. Overhead catenary is the system installed overtop of the rails of a light rail system, to provide operational power to the LRVs (Light Rail Vehicles). Installation will take place January 11-22, 2021 between the hours of 9:00 p.m. and 6:00 a.m. Read more »