Bermondsey Road
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street

Road Reconstruction at Credit Union and Swift Drive
What Work is Taking Place?
Crews will be conducting roadway surface reconstruction approaching and within the Swift and Credit Union Drive intersection along Eglinton Avenue East. The reconstruction follows the completion of utilities work in this area. Read more »
Update: Wilson Brook Culvert Works East of Sloane
What Work is Taking Place?
Due to variable weather conditions and to support the continued progress on the Wilson Brook Culvert works, a generator will be onsite to operate a water pumping system to remove accumulated precipitation from the construction zone. It may run continuously, including overnight between 11 p.m. and 7 a.m. for the next 4-6 weeks as required based on weather conditions. Read more »
Extended: Watermain, Storm, and Sanitary Relocation at Eglinton Avenue East and Swift Drive Intersection
What Work is Taking Place?
As part of the construction of the future surface area stops, crews continue to upgrade and relocate wet utilities along Eglinton Avenue East between Credit Union Drive and Swift Drive.
In an effort to minimize disruption and to protect the safety of the local community and commuters, work will be performed overnight beginning as early as Monday, October 22nd, 2018 and last until the end of November 2018. Read more »
Watermain, Storm, and Sanitary Relocation at Eglinton Avenue East and Swift Drive Intersection
What Work is Taking Place?
As part of the construction of the future surface area stops, crews continue to upgrade and relocate wet utilities along Eglinton Avenue East between Credit Union Drive and Swift Drive.
In an effort to minimize disruption and to protect the safety of the local community and commuters, work will be performed overnight beginning as early as Monday, October 22nd, 2018 and last for approximately two (2) weeks. Read more »
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park for October 4, 2018. You can see the presentation here:
Temporary Traffic Changes at East Don River Bridge to Facilitate Early Morning Deck Pour
What Work is Taking Place?
The East Don River and Wynford Drive Bridges are being rehabilitated as part of the construction of the Eglinton Crosstown LRT. Works include deck replacement, reinforcement, and repairs to the supports and beams to both bridges.
As part of the ongoing works crews will be conducting deck pouring at the East Don River Bridge. This work is scheduled to start as early as Saturday, September 22nd — to facilitate this work there will be a temporary traffic staging. Read more »
UPDATED: Wilson Brook Culvert Work Begins East of Future Sloane Stop
What Work is Taking Place?
As part of the ongoing works to build the LRT system along Eglinton Avenue, work on the Wilson Brook Culvert will be taking place on the south and north side of Eglinton Avenue in front of 1730 Eglinton Avenue East. This work is expected to begin as early as Wednesday, August 16 to December 15, 2018.
Crews will be building a temporary storm drain line, as well as excavating and replacing the storm water culvert under Eglinton Ave East. Read more »
Wilson Brook Culvert Work Begins East of Future Sloane Stop
What Work is Taking Place? Read more »
Reissue: Hydro Utility Relocation between Bermondsey and Birchmount for the Eglinton Crosstown LRT
What Work is Taking Place?
The Eglinton roadway is changing as work continues to prepare for the construction of the surface section of the Eglinton Crosstown LRT that will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level.
Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located. Read more »
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
The construction liaison committee meeting of Brentcliffe - Victoria Park for June 14, 2018. You can see the presentation here: