Birchmount Road
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street

Preparatory Road Works on Eglinton Avenue East for Surface Stops
Preparatory Road Works on Eglinton Avenue East for Surface Stops
The surface section of the Eglinton Crosstown LRT will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level. To prepare for the construction of the surface section, crews are working to get the roadway ready.
Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be located. Read more »
Pharmacy - Kennedy Construction Liaison Committee Meeting
The construction liaison committee meeting of stops and station between Pharmacy and Kennedy was held on May 30, 2017. You can see the presentation here:
Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017
What Work is Taking Place?
As part of ongoing preparatory works, crews will begin the process of removing street furniture across the Eglinton Avenue East corridor between Brentcliffe Road and Midland Avenue. Read more »
Ongoing Clearing, Grubbing and Pruning between Don Avon Drive and Rosemount Drivein Preparation for Construction of Surface Stops
What work is Taking Place? Read more »
Surface Section and Kennedy Station Open House
Thank you for attending our Surface Section and Kennedy Station Open House on April 5, 2017.
For those of you who missed it, the presentation is here:
Ongoing Preparatory Works between Brentcliffe Road and Midland Avenue: Street Furniture Removals SPRING & SUMMER 2017
What Work is Taking Place? Read more »
Clearing, Grubbing and Pruning between Victoria Park Avenue and Rosemount Drive in Preparation for Construction of Surface Stops
What work is Taking Place? Read more »
Subsurface Utility Engineering Investigation Continues Between Midland Road and Leslie Street
What Work is Taking Place? Read more »