What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Laneway Closure at Chaplin Station Friday, October 28 – Friday, November 4, 2022
What Work Is Taking Place?
The laneway located between Chaplin Crescent and Russell Hill Road, south of Eglinton Avenue, will be closed periodically between Friday, October 28 – Friday, November 4, 2022, to accommodate waterproofing works on the roof of the Tertiary Entrance. The closures will take place Monday - Friday, between 8:00 a.m. - 5:00 p.m. Once the work is completed, the laneway will reopen.
Traffic Signal Installations at Mount Pleasant Station - October 27, 2022
What Work is Taking Place? Read more »
Laneway Closure for Main Entrance Construction at Oakwood Station Thursday, October 27, 2022
What Work is Taking Place?
The laneway north of Oakwood Station’s Main Entrance site will be closed on Thursday, October 27, 2022, while crews facilitate a concrete pour at the Main Entrance. The laneway will be closed to through traffic to facilitate these activities safely.
Notice of Power Outage - Sunday, October 23, 2022
What Work is Taking Place?
On Sunday, October 23, 2022, crews will install overhead electrical cables on the south side of Eglinton Avenue East, west of Hanna Road. A power outage is required to facilitate this work. Power service will be restored upon completion of the work. Please carefully read the power outage details below.
Power Outage Details:
• On Sunday, October 23, 2022, between 8:00 a.m. – 3:00 p.m. for approximately thirty (30) minutes.
• The following properties will be affected: Read more »
Short-Term Power Outage - Sunday, October 23, 2022
What Work is Taking Place?
On Sunday, October 23, 2022, crews will install overhead electrical cables on the south side of Eglinton Avenue East, west of Hanna Road. A power outage is required to facilitate this work. Power service will be restored upon completion of the work. Please carefully read the power outage details below.
Power Outage Details:
• On Sunday, October 23, 2022, between 8:00 a.m. – 3:00 p.m. for approximately thirty (30) minutes. Read more »
Laneway Closure for Main Entrance Construction at Oakwood Station - Tuesday, October 25, 2022
What Work is Taking Place?
The laneway north of Oakwood Station’s Main Entrance site will be closed on Tuesday, October 25, 2022, while crews facilitate a concrete pour at the Main Entrance. The laneway will be closed to through traffic to facilitate these activities safely.
Notice of Water Shut-off at Chaplin Station - Monday, October 24, 2022
What Work Is Taking Place?
On Monday, October 24, 2022, crews will perform fire hydrant works at Chaplin Station. A water shut-off is required to facilitate the work. The water shut-off will start as early as 8:00 a.m. for approximately eight (8) hours. Water service will be restored upon completion of the work. Please carefully read the water shut-off details below.
Water Shut-off Details: Read more »