What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
October 15 2019

Upcoming Berwick Avenue Road Closures for TTC Line 1 Facility Service Building Construction October 19 – 21, 2019

What Work is Taking Place?

In 2019, crews have conducted a series of closures of Berwick Avenue between Duplex Avenue and Yonge Street to perform supporting construction activities for TTC’s Line 1 Subway Facility Services Building.  Due to the location of the new building, the work can only be carried out safely while the subway is not in operation.   Read more »

October 11 2019
October 11 2019

Concrete Pours at Caledonia Station - October 2019

What Work is Taking Place?

In October 2019, crews will at Caledonia will perform several large concrete pours. Westbound Eglinton Ave W will be reduced to one (1) lane only between Blackthorne Ave and Gabian Way.

Hours of Work  Read more »

October 10 2019

Upcoming Traffic Configuration Change at Yonge and Eglinton Intersection to Support Tunnel Ventilation Shaft Construction

 

In mid-October 2019, a new traffic configuration will be implemented at Yonge Street and Eglinton Avenue to facilitate construction of a tunnel ventilation shaft for TTC’s Line 1 subway.  

In order to facilitate the work, a new work zone will be erected in the middle of the Yonge Street between Eglinton Avenue East and Roehampton Avenue, with vehicle traffic travelling on either side of the work zone.   Read more »

October 10 2019

GUIDEWAY CONSTRUCTION ENDS AT CREDIT UNION-SWIFT

GUIDEWAY CONSTRUCTION ENDS AT CREDIT UNION-SWIFT   

WHAT WORK IS TAKING PLACE? Read more »

October 10 2019

RETAINING WALL CONSTRUCTION: EGLINTON AVENUE EAST AT SADDLE RIDGE DRIVE

ORIGINAL POST: AUGUST 13, 2019

UPDATED: OCTOBER 10, 2019

RETAINING WALL CONSTRUCTION: Read more »