March 18 2019

Update: TRAFFIC & PEDESTRIAN CHANGES LEASIDE STATION

UPDATED: March 21, 2019

On March 27 and 28, the traffic conditions at Bayview Avenue and Eglinton Avenue East will change. These changes will facilitate work on a large watermain on the north east corner of the intersection. Read more »

March 15 2019

Overnight Utilities Relocations at Eglinton Avenue East and Swift Drive

WHAT WORK IS TAKING PLACE?

Roadway widening and surface reconstruction is underway at the Eglinton Avenue East and Swift Drive intersection. Access to Eglinton Avenue East via Swift Drive will remain closed until mid-April 2019. As part of these activities, crews will be relocating underground telecommunication lines, requiring an expanded work zone (depicted below). Work will begin as early as Friday March 15, 2019. Read more »

March 15 2019

Intersection closure for watermain repair at Fairbank Station Friday, March 15, 2019

What Work is Taking Place?

Due to a watermain break beneath the intersection at Dufferin Avenue and Eglinton Avenue, crews will be on site Friday evening to perform emergency repair on the water main.  It is unknown how long repairs will take to complete, so overnight work is possible.  No service interruptions are anticipated at this time. 

 

Hours of Work

  • Work will begin Friday evening at 7:00 p.m. and will take several hours to complete
  • Overnight work is possible

  Read more »

March 14 2019

Overnight Hydro Utility Installation Work at Mount Pleasant Station March 14 – 16, 2019

What Work is Taking Place?

On Thursday March 14 and Friday March 15, crews will work overnight to complete hydro utility installation on the southwest corner of Mt Pleasant Road and Eglinton Avenue East.  This work will be carried out between 3:00 p.m. and 1:30 a.m., approximately.  Due to ongoing welding work in preparation of the upcoming traffic bridge, this work must be performed during a separate evening shift.

Hours of Work Read more »

March 13 2019

Duct Bank Concrete Pour of Guideway- Eglinton Square to Pharmacy Avenue

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will conducting a concrete pour of the guideway in the center of Eglinton Avenue East between Eglinton Square and Pharmacy Avenue.  Read more »

March 13 2019

Eglinton & Mount Pleasant Construction Liaison Committee Meeting

The construction liaison committee meeting of Eglinton and Mount Pleasant Stations was held on March 12, 2019. You can see the presentation here: 

 

Download the presentation

March 13 2019

Updated: Guideway Work along Surface Section of the Eglinton Crosstown LRT: Warden Avenue to Birchmount Road

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be continuing guideway work in the center of Eglinton Avenue East between Warden Avenue and Birchmount Road. Starting as early as March 16, 2019 for approximately eight (8) months.

The work includes cutting and removal of existing asphalt, excavation, installation of subgrade materials, duct banks installation and track drainage, track slab and stops.  Read more »

March 13 2019

Emergency Roadway Repairs on Yonge Street at Eglinton Station

What Work is Taking Place?

In order to carry out repairs on the asphalt on Yonge Street, crews have shifted traffic on Yonge Street to the west side, closed the north-south crosswalk on the east side of the Yonge-Eglinton intersection, and re-opened the crosswalk on the west. This will be temporary until the repairs are complete on March 16.

On completion, the traffic will revert back to the previous stage to complete the excavation around the TTC Line 1 Subway box.

 

Hours of Work Read more »

March 13 2019

Extended: Sidewalk Closure for Civil Road Work between Pharmacy Avenue and Lebovic Avenue

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting civil road work in relation to road widening works on the south side of Eglinton Avenue East between Pharmacy Avenue and Lebovic Avenue.  Work began in February 2019 and will be extended until the end of March 2019.

There will be sidewalk closure on the south side of Eglinton Avenue East between Pharmacy Avenue and Lebovic Avenue in order to safely carry out the work.

Hours of Work Read more »

March 12 2019

Intermittent Sidewalk Closure for Civil Road Work from Thermos Road to Birchmount Road

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting civil road work in relation to road widening works on the north side of Eglinton Avenue East between Thermos Road and Birchmount Road.

There will be intermittent sidewalk closure on the north side of Eglinton Avenue East between Thermos Road and Birchmount Road in order to safely carry out the work. Read more »