January 18 2019

Extended: Telecommunication Relocation Work between Victoria Park Avenue and Birchmount Road

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will continue to relocate and upgrade existing overhead and underground telecommunication between Victoria Park Avenue and Birchmount Road.

Telecom work has been extended until the Spring 2019.

Read more »

January 18 2019

Overnight Traffic Change at Forest Hill Station

What Work is Taking Place? 

As early as January 20, 2019, a new traffic configuration will be implemented at Forest Hill Station.  Traffic on Bathurst Street will be shifted to the east side, and traffic on Eglinton Avenue will remain on the south.  This configuration will be in place for approximately three weeks until early February 2019.  Pile installation, excavation and utilities work will continue through winter 2019. Read more »

January 16 2019

Overnight Traffic Change at Forest Hill Station

Originally Published: January 7, 2019

Updated: January 16, 2019 

What Work Is Taking Place? Read more »

January 15 2019

Duct Bank Concrete Pour of Guideway Between Eglinton Square to Pharmacy Avenue

Last Updated: January 24, 2019

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will conducting a concrete pour of the guideway in the center of Eglinton Avenue East between Eglinton Square and Pharmacy Avenue. Read more »

January 15 2019

Oakwood - Works in the Laneway UPDATE

Minor Laneway Disruptions

WHAT WORK IS TAKING PLACE?

Crews are required to perform urgent repairs to the overhead crane at Oakwood Main Entrance. Crews will need to access a portion of the crane from the laneway.

 TIMING

  • The work will occur between 8:00 a.m. and 3 p.m. on Tuesday January 15th, 2019

 

WHAT TO EXPECT Read more »

January 12 2019

Construction Notice - Mount Pleasant - Overnight Duct Bank Work

Overnight Hydro Duct Bank Installation Work at Mount Pleasant Station

January 2019

 

What Work is Taking Place? Read more »

January 11 2019

New Traffic Configuration: Eglinton Avenue East between Sloane Avenue and Victoria Park Avenue

Last Updated: January 14, 2019

WHAT WORK IS TAKING PLACE?

As part of utility relocations, road widening and road reconstruction along Eglinton Avenue East between Sloane Avenue and Victoria Park Avenue, new traffic staging (depicted below) will be implemented as early as January 15, 2019. This traffic configuration will be in place for up to four (4) weeks.

All works are in support of the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East. Read more »

January 10 2019

Lane Restrictions at Eglinton Avenue East and Kennedy Road for Catch Basin Repairs

What Work is Taking Place? 

Crews will be conducting repairs to catch basin located on Eglinton Avenue East – east of Kennedy Road as early as Thursday, January 10, 2019 and resume on Sunday, January 13 to Tuesday, January 15, 2019. Read more »

January 10 2019

Watermain Upgrade at Victoria Park and Eglinton Avenue East Intersection

Last Updated: January 11, 2019

WHAT WORK IS TAKING PLACE?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be upgrading the existing watermains at Victoria Park Ave crossing the Eglinton LRT guideway. This work requires digging a trench to access and upgrade the existing watermain as well as installing new control valves. Read more »