March 7, 2016

Information as of March 7, 2016

 

The Eglinton Crosstown is a 19-kilometre light rail transit (LRT) line that will run along Eglinton Avenue through the heart of Toronto, with an underground central section. The line will connect Mount Dennis in the west to Kennedy Road in the east, and the new service will be up to 60% faster than the bus service today.

 

Geophysical studies for future Oakwood Station

 

What work is taking place? 

·        

A crew will be conducting geophysical studies to determine the soil characteristics in the area.

·        

The test is done by hitting the bare asphalt with a solid pipe, which produces a dull thud. The seismic signal produced by this hit is recorded by instruments on the ground.  

·        

This is a non-destructive non-invasive test carried out along a straight line.  

·        

The test is done at nine meter intervals.

 

When:            

·        

The seismic testing is expected to take place during the week of March 14, 2016.

·        

The work will take place between 11 pm and 5 am, when there is the least car and truck activity on the road.

·        

It is estimated work will take less than one night to complete.

·        

The work may be rescheduled due to weather conditions.

 

Where:

·        

Our crews will move along Eglinton Avenue West, from Oakwood Avenue to Glenholme Avenue.

Oakwood from Time rd to Glenhome Ave

Noise

·        

Residents near the work site can expect some noise due to testing and use of equipment. 

Traffic Details:

·        

Temporary lane closures will be required along the westbound lane of Eglinton Avenue West.

·        

A paid-duty officer will be in place to provide traffic control assistance at intersections, as required.

·        

Access to and from properties will be maintained.

·        

As always, please take care when travelling near construction areas.

Please Contact Us

For more information, please contact Lancefield Morgan at lancefield.morgan@metrolinx.com or Tel: (416) 782-3939

Thank you for your continued patience as we work to build this important project. 

Please support your local businesses during construction