Monitoring Equipment Installation at intersection of Avenue Road and Eglinton Avenue West
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Friday September 4 and Tuesday September 8 2015
What: Crews will continue installing monitoring equipment at the intersection of Avenue Road and Eglinton Avenue West. This equipment will measure important data related to the work of our tunnel boring machines underground.
Where: The equipment will continue to be installed within the roadway along Eglinton Avenue West and Avenue Road.
When: Specifically for the intersection of Avenue Road and Eglinton Avenue West of the monitoring equipment will be installed:
Friday September 4, with work beginning at 8:00 am and to be complete by 5:00 pm.
Tuesday September 8, with work beginning at 8:00 am and to be complete by 5:00 pm.
Traffic Details
- Traffic will be reduced to one lane in each direction near the work zone, and temporary lane closures will be required to allow crews to perform work safely
- Traffic will be diverted around the work zone, separated by traffic cones
- On-street parking on Eglinton in the vicinity of the work will not be available.A Paid Duty Officer will be in the intersection to direct motorists as needed in the intersection.
Pedestrians:
Pedestrians will not be affected by this work. Access to all stores and businesses in the area will remain open during this installation. As always, please take care when travelling near construction areas.
Work Hours
This set up and/or work will be carried out as early as 7:00 a.m. and as late as 11:00 p.m. Efforts will be made to expedite the work as much as possible.