March 13 2018

Black Creek Drive Lane Closures

Updated March 13

WHAT WORK IS TAKING PLACE? Read more »

March 12 2018

Shoring at Chaplin Station Main Entrance

WHAT WORK IS TAKING PLACE?

Support of excavation (or shoring) continues at Chaplin Station. At the Main Entrance site, located on the northeast corner of Chaplin and Eglinton, there are some piles that remain to be installed.

As early as Wednesday, March 14, crews will begin piling activities at the Main Entrance. The drill will cross Eglinton to the Main Entrance site as early as Monday, March 12.

TIMING  Read more »

March 09 2018

Overnight Road Repair Work Starting March 12 - Traffic Lane Reductions at Don Mills & Eglinton

What Work is Taking Place?

Ongoing road maintenance continues around the Don Mills Road and Eglinton Avenue East intersection. The rebuilding of catch basins on Eglinton Avenue East between the DVP and Don Mills Road will start on Monday, March 12, 2018 for approximately one week.

To minimize traffic disruption for the community, transit users and local businesses, this work is being done overnight.

Hours of Work Read more »

March 09 2018

Resumption of Storm Sewer Installation at Mount Pleasant Station

What Work is Taking Place?

In December 2018, crews began installation of a new storm sewer along the south side of Eglinton Avenue East.  Beginning March 8, storm sewer installation will resume.  The storm sewer will be installed using a hand-mining method whereby pipe is hydraulically pushed through the soil from the shafts at Taunton Road and Brownlow Avenue while soil is simultaneously removed.  Once the pipe installation is complete, connection work will be performed to connect the new storm sewer to the existing storm infrastructure. Read more »

March 08 2018
March 08 2018

Bell Utility Relocations Between Gervais Dr & Victoria Park Ave

What Work is Taking Place?

The Eglinton roadway is changing as work continues to prepare for the construction of the surface section of the Eglinton Crosstown LRT that will run down the centre of Eglinton Avenue East in dedicated transit lanes at street level.  Setting up the construction work zones in the roadway will require changes to how car and truck, bus, and pedestrian traffic flows along Eglinton Avenue East and the associated intersections where future stops will be l Read more »

March 08 2018

Chaplin and Avenue Construction Liaison Committee Meeting

The construction liaison committee meeting of Chaplin and Avenue Stations was held on March 7, 2018. You can see the presentation here: Read more »

March 06 2018

Sidewalk Repairs at Leaside Station on March 7

WHAT WORK IS TAKING PLACE?

On Wednesday, March 7 Leaside station crews will complete repairs on a section of sidewalk on the north side of Eglinton Avenue between Bayview Avenue and the Metro driveway. 

 Read more »

March 06 2018

Overnight Work at Oakwood Station-UPDATED MARCH 6 2018

 

Original Issue Date: January 31, 2018

Updated and Reposted: March 5, 2018 Read more »