What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Crane Installation at Laird Station Main Entrance
A large tower crane will be delivered and installed at the Laird Main Entrance during the week of July 3rd.
What to Expect Read more »
Mount Dennis Railway Corridor Work - July 4 to July 30, 2017
What Work is Taking Place?
Crews are working in the rail corridor, within the vicinity of the Eglinton Avenue Bridge, preparing for the relocation of the CP Mainline Track. This work involves grading the track bed in the area where the tracks will be realigned, track bed leveling and shifting of the CP Diversion track to the correct alignment and cutting over-/shifting of the existing track.
Hours of Work Read more »
Cedarvale - Forest Hill Construction Liaison Committee Meeting
The construction liaison committee meeting of Cedarvale and Forest Hill stations was held on June 28, 2017. You can see the presentation here:
Pharmacy - Kennedy Construction Liaison Committee Meeting
The construction liaison committee meeting of stops and station between Pharmacy and Kennedy was held on June 27, 2017. You can see the presentation here:
Chaplin Station: Pedestrian Pathway Change
Since fall 2016, crews have been conducting support of excavation work (shoring) at the future Chaplin Station. Read more »
Cedarvale Station: Road Closures for Utility Relocation & Support of Excavation
What Work is Taking Place?
In June 2017, the Cedarvale Station work zones are now in full swing as crews complete tunnel concrete pours, utility relocation, and support of excavation activities.
To continue to relocate and upgrade storm and sanitary sewer infrastructure and complete support of excavation, traffic changes in the vicinity of Cedarvale Station are required.
Throughout the Summer 2017, the following roads will be closed at Eglinton Avenue West: Read more »
Storm Sewer Connection in Cedarvale Park
What Work is Taking Place?
In preparation for the construction of Cedarvale Station, several storm and sanitary sewers must be reconfigured prior to the commencement of the support of excavation works. As part of one of these relocations, an existing connection must be enabled in one of the storm sewers at Cedarvale Park.
Crews will occupy a small portion of the park in the vicinity of an existing manhole (see picture below) in order to conduct the works.
Timing Read more »
Upcoming Sanitary Sewer Connection at Eglinton Station
What Work is Taking Place
To prepare for the construction of Eglinton Station, crews have been relocating existing water mains and sanitary sewers in the vicinity of Eglinton Avenue and Yonge Street. To complete this work, crews need to connect the new sanitary sewer with the existing sewer located at the northwest corner of the Yonge-Eglinton intersection. Read more »
Hydro Utility Relocation for the Eastern End of the Eglinton Crosstown LRT Line
Crews will relocate and upgrade existing overhead hydro utilities between Birchmount Road and Kennedy Station in preparation for construction of the surface section dedicated transit lanes (guideway), the Kennedy Portal, and the Kennedy LRT Station. Existing overhead and underground hydro lines will be relocated from the north side of Eglinton Avenue East to the south side of Eglinton Avenue East.
Enbridge Gas Distribution Line Relocation Victoria Park Avenue & Eglinton Avenue East
What Work is Taking Place?
Enbridge Gas Distribution (Enbridge) is relocating a gas main in the Eglinton Crosstown LRT corridor on Eglinton Avenue East between Victoria Park Avenue and Saddle Ridge Drive.
Timing
- Work will start at the end of June 2017 and will last for approximately four weeks.
- Work will occur between 7:00 a.m. and 5:30 p.m., Monday to Friday.
- Work could be rescheduled due to weather conditions or any unforeseen circumstances.