What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
April 18 2019

Updated: Construction Notice - Sidewalk Closure for Civil Road Work between Pharmacy Avenue and Hakimi Avenue

Originally Posted: April 15, 2019 

Updated: April 18, 2019 

What Work is Taking Place? Read more »

April 18 2019

Telecommunication Relocations at Victoria Park Avenue and Eglinton Avenue East

WHAT WORK IS TAKING PLACE?

In support of construction of the future Eglinton Crosstown LRT stops and guideway (dedicated transit lane), crews will be relocating telecommunications infrastructure on Victoria Park Avenue at Eglinton Avenue East. The work will be completed in two (2) stages (depicted below), beginning as early as April 22, 2019 and continue for approximately one (1) week.  

 

TIMING  Read more »

April 18 2019

Overnight Hydro Utility Work at Mount Pleasant Station Week of Monday April 22, 2019

What Work is Taking Place?

Starting Monday April 22, crews will work overnight to complete hydro utility work in the southwest work zone at Mt Pleasant Road and Eglinton Avenue East.  This work will be carried out on a 24 hour basis for approximately five (5) days in preparing for the upcoming station roof concrete pour.  Crews will endeavour to minimize disruption as much as possible. Read more »

April 18 2019

Guideway Construction on Eglinton Avenue East At Celestica Bridge

WHAT WORK IS TAKING PLACE?

Lanes will be realigned to accommodate guideway construction on Eglinton Avenue East at the Celestica Bridge. Traffic is expected to change to the configuration depicted below as early as April 23, 2019 and continue for approximately three (3) months. 

All works are in support of the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East.

 

TIMING  Read more »

April 17 2019

Update: Cross Passage Dewatering System between Lillian Street and Redpath Avenue

WHAT WORK IS TAKING PLACE

The dewatering system at Cross Passage 10 site between Lillian Street and Redpath Avenue is now recommissioned and will operate on a 24 hour basis. Periodic maintenance will be required.

 

 

 

TRAFFIC, TTC AND PEDESTRIAN IMPACTS Read more »

April 16 2019

Construction Notice: Concrete Pour at Fairbank Station - April 18, 2019

What Work is Taking Place?

On Thursday April 18, crews will perform a concrete pour at the Main Entrance area of Fairbank Station. The concrete will form part of the Main Entrance walls.  A concrete pump will be placed on Vaughan Road behind the Main Entrance site, and concrete trucks will deliver concrete to the site.  Dufferin Street and Eglinton Avenue West will remain open while work takes place. Read more »

April 15 2019

Overnight Concrete Pour at Chaplin Station

Overnight Concrete Pour at Chaplin Station
Wednesday April 17, 2019


On Wednesday April 17, 2019, at 2:00 a.m., crews will perform a large concrete pour.  The concrete will form part of the roof of Chaplin Station.  To ensure the continuity and integrity of the activity, and to minimize the impact to TTC operations, the pour will be conducted overnight when traffic is lighter.  Some traffic restrictions will be in effect to accommodate equipment and truck access requirements.  Read more »

April 15 2019

Guideway Work along Surface Section of the Eglinton Crosstown LRT: Pharmacy Avenue at Eglinton Avenue East

Latest Update: April 23, 2019

What Work is Taking Place?

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be continuing guideway work in the center of Eglinton Avenue East between Victoria Park Avenue and Pharmacy Avenue. Starting as early as May 1, 2019 for approximately six (6) weeks.

The work includes cutting and removal of existing asphalt, excavation, installation of subgrade materials, duct banks installation and track drainage, track slab and stops.  Read more »

April 12 2019

Duct Bank Installation at Warden Avenue for Traction Power Substation (TPSS) 11

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting duct bank installation in preparation for the construction of the Traction Power Substation (TPSS) 11 that will power the Eglinton Crosstown Light Rail Transit (ECLRT) line. The work will take place at the south west corner of Warden Ave and Eglinton Ave East Intersection. Read more »