Mount Dennis Railway Corridor Work
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
May 31-June 30 2017
What Work is Taking Place?
Crews are working in the rail corridor, north of the Eglinton Avenue Bridge, completing piling work for the centre shoring wall. Crews will also be conducting preparatory work for the relocation of the CP Mainline Track. This work involves grading the track bed in the area where the tracks will be realigned, track bed leveling and shifting of the GO Transit W1 track to the correct alignment and cutting over-/shifting of the existing track.
Hours of Work
- This work will occur between 7:00 a.m. and 6:00 p.m. daily.
- Please note that work could be rescheduled due to weather conditions or unforeseen circumstances.
What to Expect
- Nearby residents and businesses can expect to hear noise related to the equipment used to level the ground and the track work.
Please Contact Us
For more information about this work, please contact Lancefield Morgan at 416-782-8118 or crosstown@metrolinx.com.
aCrosstown
Download our new mobile app for traffic and transit information
Please support your local businesses during construction
Thank you for your patience as we work to build this important project
Sign up at thecrosstown.ca/sign-up now to receive regular email updates