Oakwood Avenue

Looking for updates near a specific intersection?

Choose an intersection from the drop down list to view all of the latest news and construction updates in that area. Intersections are listed from west to east with Eglinton as the main cross-street.




Syndicate content
 
July 202017

Crane Delivery and Installation at Oakwood Station

What Work is Taking Place?

 

A large overhead crane will be delivered and installed at the Oakwood Main Entrance starting the week of July 24th.   Read more »

July 122017

Upcoming: Shoring and Excavation at Oakwood Station

 

Since 2016, shoring and excavation work has been underway at the main and secondary entrance sites for the future Oakwood Station. Excavation at the Main entrance is currently underway and will be followed by mining operations in late 2017.  Read more »

May 172017
April 132017

Construction Material Storage for Oakwood Station

Construction Material Storage for Oakwood Station 

 

What work is taking place?

  Read more »

April 072017

Fairbank and Oakwood Stations Open House

Thank you for attending our Fairbank and Oakwood Stations Open House on April 6, 2017.

For those of you who missed it, the presentation is here:

Read more »

March 312017

LOW WATER PRESSURE NOTICE: Watermain Investigation Work

What Work is Taking Place?

On April 3, 2017, crews will begin subsurface utility engineering (SUE) investigation of a large 900mm watermain in the Eglinton Avenue West and Chaplin Crescent area.  The watermain will be exposed to determine the utility and ground conditions in advance of wet utilities relocation.  Most of the work will take place within the existing traffic staging at Chaplin Crescent and Eglinton Avenue West. Read more »

March 292017

Geotechnical Equipment Installations and Monitoring at Oakwood Station

Geotechnical Equipment Installations and Monitoring at

 Oakwood Station 

  Read more »

March 092017

CORRECTION: Unplanned Utilities Work at Oakwood Station

What Work is Taking Place?

Over the next two (2) weeks, crews will complete work on sewer utility on Eglinton Ave W between Oakwood Ave and Times Road.  During this work the Green P will be open, however access from Eglinton Ave will be closed.  Read more »

December 232016

Short Term Lane Closures along Eglinton Avenue for Monitoring Equipment Installation for Oakwood Station

What Work is Taking Place?

Crews will be installing ground movement monitoring equipment at Oakwood station. These monitors will provide information on ground conditions during station construction. Read more »