What's New?
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
Sidewalk Restoration Works at Oakwood Station - Early May 2022
What Work is Taking Place?
In early May 2022, crews at Oakwood Station will begin sidewalk restoration works on the north side of Eglinton Avenue West, east and west of the Main Entrance site (refer to map). This work will take place between 7:00 a.m. – 7:00 p.m. for approximately one (1) week. Short-term pedestrian rerouting may be required to complete this work.
Notice of Power Outage at Fairbank Station - April 12, 2022
Notice of Power Outage at Fairbank Station
What Work is Taking Place?
On Tuesday, April 12, 2022, crews will be continuing overhead power cable installations at Fairbank Station. A power outage is required to facilitate this work. Power service will be restored upon completion of the work. Please carefully read the temporary power outage details below.
Power Outage Details:
Lane Reductions for Monitoring Installations at Oakwood Station - As early as April 11 , 2022
Work is Taking Place?
As early as Monday, April 11, 2022, crews at Oakwood Station will install monitoring equipment on Eglinton Avenue West, west of Oakwood Avenue. Rolling lane closures are required to complete this work. Eglinton Avenue West will be reduced to one lane in each direction, while this work takes place. This work expected to take place between 9:00 a.m. – 4:00 p.m. for approximately four (4) days.
UPDATE: Watermain Connection Work – Eglinton Avenue East and Brentcliffe Road - April 11, 2022
REPOSTED APRIL 7, 2022
POSTPONED IN MID-MARCH 2022 Read more »
Extended: Chaplin Crescent Closure for Utility and Road Restoration Works - Until mid April 2022
What Work is Taking Place?
Chaplin Crescent will remain closed between Eglinton Avenue West and the Chaplin-Russel Hill laneway until mid-April 2022, as crews continue road and sidewalk restoration works . Eglinton Avenue West will remain open. Significant traffic changes will be in effect. Please carefully read the details below.