Overnight Work and Road Closure at Berwick Avenue for Facility Services Building Construction at Eglinton Station
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
Choose an intersection (A to Z)
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
December 6, 2018
What Work is Taking Place?
On December 9, 2018, crews will be working on Berwick Avenue to carry out supporting activities for construction of the Facility Services Building for the TTC Line 1 Subway system.
Timing
- Work will occur on December 9 from approximately 1:00 a.m. to 7:00 a.m.
- Work may be re-scheduled due to weather or other unforeseen circumstances.
What to Expect
- Berwick Avenue will close between Duplex Avenue and Yonge Street for the duration of the work.
- Nearby residents and businesses can expect some noise in the area caused by construction equipment, truck traffic entering and exiting the work zone, and equipment and material storage within designated work zones.
- All access to business entrances will be maintained throughout construction.
- Access to Oxford Loading Dock and TTC Bus Bay will be maintained at all times.
- Pedestrian access will be maintained along the north side of Berwick Avenue from Duplex Avenue to Yonge Street. At times, pedestrians may be asked to halt or divert around the crane movements.
Travelling Smart during Construction
Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10:00 a.m. and 3:00 p.m.
Stay Informed
Sign up for e-mail updates or download the aCrosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.
Disponible en francais
Categories: