What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
February 28 2013

Designing the Future of Eglinton: Public Workshops

We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.

Metrolinx will be presenting preliminary designs for stations, including some inforamtion that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »

Categories:
February 28 2013

Central Station Reference Concept Design Online Consultation

The online consultation for the Central Station Reference Concept Design is now closed. Thank you to everyone who attended the open house or sent comments to us online. 

Please review the public consultation report (PDF). Read more »

February 26 2013

Designing the Future of Eglinton: Public Workshops

We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.

Metrolinx will be presenting preliminary designs for stations, including some inforamtion that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »

Categories:
February 26 2013

Functional Design Presentation At-Grade Section: Don Mills to Ionview Online Consultation

The online consultation for the Functional Design Presentation At-Grade Section: Don Mills to Ionview is now closed. Thank you to everyone who attended the open house or sent comments to us online. 

Please review the public consultation report (PDF). Read more »

February 19 2013

Designing the Future of Eglinton: Public Workshops

We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.

Metrolinx will be presenting preliminary designs for stations, including some information that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »

Categories:
February 19 2013

West Station Reference Concept Design Online Consultation

The online consultation for the West Station Reference Concept Design is now closed. Thank you to everyone who attended the open house or sent comments to us online. 

Please review the public consultation report (PDF). Read more »

February 08 2013

Designing the Future of Eglinton: Public Workshops

We want to hear from you! Join us at any of the three public workshops on February 19, 26 and 28, 2013 to tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure.

Metrolinx will be presenting preliminary designs for stations, including some inforamtion that was not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events. Read more »

January 31 2013

Environmental Assessment Update: East Tunnel Alignment

Rapid and reliable transit is coming to the centre of Toronto. The Crosstown will move Torontonians to work, school and play faster than ever before – reducing travel times and enhancing our economy and our environment. The Crosstown will run along Eglinton Avenue and transit travel will be up to 60% faster than today. Read more »

Categories:
January 21 2013

Environmental Assessment Update: East Tunnel Alignment

Metrolinx invites you to attend a follow-up meeting on the east tunnel extension to just east of Don Mills Station. A public meeting was held in December to provide a project update, to present proposed changes to the tunnel alignment, and to receive input from the public on those changes. Now, Metrolinx wants to share the input received and discuss next steps. Read more »

January 03 2013

Laird Drive to Don Valley Parkway Environmental Assessment Online Consultation Update

Metrolinx is undertaking an amendment to the Eglinton Crosstown LRT Environmental Assessment (EA). Including a change in the east tunnel launch location from east of Laird Station (near Brentcliffe Road) to just east of Don Mills Station. Read more »