TTC Line 1 Closure for Eglinton Station LRT Construction - Saturday July 18 & Sunday July 19, 2020
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
What Work is Taking Place?
TTC’s Line 1 subway will be closed between Lawrence and St. Clair stations from Saturday July 18 and Sunday July 19, 2020, while crews perform work at the Berwick Portal site located on the south side of Berwick Avenue at Yonge Street. Construction activities will include installation of insulation at track level, removal of scaffolding and formwork, truss installation and surveying. Work will take place on a 24 hour basis from 2:00 a.m. on Saturday July 18 until 3:00 a.m. on Monday July 20, 2020. Berwick Avenue will remain open while this work takes place.
Hours of Work
• Construction will take place Saturday July 18, 2020 at 2:00 a.m. – Monday July 20, 2020 at 3:00 a.m.
• Crews will work 24 hours during the subway closure
• Please note that this work is subject to cancellation
Work Area Map
TTC Details
TTC Line 1 subway will be closed on Saturday July 18 and Sunday July 19, 2020 between Lawrence and St. Clair stations. Please visit TTC’s website www.ttc.ca, under “Scheduled Subway Closures” for more information on subway closures and shuttle bus operation.
What to Expect
• Existing construction zones at Yonge St and Eglinton Ave and Yonge St and Berwick Ave will remain in place
• Noise from construction activity can be expected
• All property access will be maintained
Traffic and Pedestrian Details
• No change to the existing traffic and pedestrian configuration is required for this work
Travelling Smart during Construction
Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10:00 a.m. and 3:00 p.m.
Stay Informed
Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.
Disponible en français