What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
June 18 2018

Allen Road South Closure July 6-9* Due to Exit Ramp Re-Alignment

*Dates may be adjusted due to weather or unforeseen circumstances

What Work is Taking Place Read more »

June 18 2018

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

The construction liaison committee meeting of Brentcliffe - Victoria Park for June 14, 2018. You can see the presentation here:

Read more »

June 18 2018

Upcoming Traffic and Pedestrian Changes at Eglinton West Subway Station (Cedarvale)

In Summer 2018, the area around Eglinton West Subway Station (Cedarvale) will see another round of traffic changes.  Work zones will move to the north side of Eglinton Avenue. The Allen Road exit ramp will be realigned, pedestrians will no longer be able to access the subway from the north side of Eglinton Avenue and active traffic lanes will shift south.  Read more »

June 18 2018

Notice of Planned Overnight Water Shut-Off Thursday June 21, 2018

What Work is Taking Place?

On Thursday June 21, crews will perform watermain valve work in the vicinity of Holly Street and Eglinton Avenue East as part of the construction of Eglinton Station. A temporary water shut-off is required to perform this work.  To minimize the impact to affected properties, this work will be carried out overnight.

Affected Properties Read more »

June 18 2018

TRAFFIC AND PEDESTRIAN CHANGES AT FAIRBANK STATION

WHAT WORK IS TAKING PLACE?

On Monday June 18, 2018, a new traffic stage will be implemented at Dufferin Street and Eglinton Avenue West to accommodate the ongoing support of excavation activities for Fairbank Station, including piling and shallow excavation.  Please carefully review the map, as new pedestrian and roads changes will be in effect. Read more »

June 18 2018

Allen Road South Closure July 6-9* Due to Exit Ramp Re-Alignment

 

*Dates may be adjusted due to weather or unforeseen circumstances

What Work is Taking Place Read more »

June 18 2018

Allen Road South Closure July 6-9* Due to Exit Ramp Re-Alignment

*Dates may be adjusted due to weather or unforeseen circumstances.

 What Work is Taking Place Read more »

June 15 2018

Overnight Traffic Set Up at Leaside Station

Originally Published: June 15, 2018

Updated: June 18, 2018

What Work is Taking Place?

On Monday, June 18 starting at approximately 9:00 p.m., crews will make changes to the existing traffic staging at Bayview Ave and Eglinton Ave E to accommodate the next stage of shoring in the roadway. Set up work will last approximately 14 hours. Shoring at Leaside Station is being completed in several stages. Read more »

June 13 2018

Upcoming Works at Eglinton Station: Next Phase of Support of Excavation

What Work is Taking Place?

Support of excavation work, also known as shoring, has commenced to make way for the future Eglinton interchange station. This work will include pile installation, jet grouting and road deck installation. Shoring at the TTC bus depot and along south side of Eglinton has been complete. The work is carried out along the north side of Eglinton.

The next phase (depicted below) will take approximately 2-3 months to complete. The entire shoring process will take approximately twenty-four (24) months to complete. Read more »