What's New?

Looking for information related to a specific area?

Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).

 
Syndicate content
 
November 26 2019

Construction Notice: Closure of Chaplin Crescent for Overnight Concrete Pour on Nov 28

*Updated on Nov 26 - This work has been rescheduled to Nov 28, due to inclement weather concerns* Read more »

November 25 2019

Concrete Pour at Mount Pleasant Station Wednesday, November 27, 2019

 

Update: Concrete Pour at Mount Pleasant Station Read more »

Categories:
November 24 2019

Decking Repair and Concrete Pour at Leaside Station

 

Decking Repair and Concrete Pour at Leaside Station

  Read more »

Categories:
November 22 2019

CONCRETE POUR AT LAIRD STATION NOVEMBER 26 2019

CONCRETE POUR AT LAIRD STATION Read more »

Categories:
November 20 2019

Upcoming Crane and Building Delivery of TPSS 11 - Monday November 25 – Thursday November 28, 2019

 

What Work is Taking Place

The Traction Power Substation 11 (TPSS 11) building will be delivered to Scarborough Nissan on Monday November 25, 2019. The TPSS 11 will be delivered in three oversized loads. Vehicles carrying the loads will travel southbound on Warden Avenue and continue eastbound on Civic Road. 

Traffic will be temporarily stopped south of Civic Road in both directions to accommodate the delivery. Read more »

November 20 2019

Line 1 Subway Closure for TTC Line 1 Facility Service Building Construction - November 30 – December 1, 2019

 

What Work is Taking Place?

Construction of a new Facility Service Building for TTC’s Line 1 Subway is underway at Berwick Avenue and Yonge Street.  Some of the work can only be safely performed while the subway is not operational.  Crews will work Friday November 29 through Monday December 2, 2019, to install plates on the track level, plumbing, hydro duct bank installation, strut installation and investigative work.   Read more »

November 20 2019

Upcoming Lane Closure Between Wynford Drive and Credit Union Drive for Oversized Delivery of Building Pieces

Upcoming Lane Closure Between Wynford Drive and Credit Union Drive for Oversized Delivery of Building Pieces

Friday November 22 – Sunday November 24, 2019

What Work is Taking Place? Read more »

November 20 2019

New Traffic Configuration at Rosemount Drive Road and Eglinton Avenue East

 

What Work is Taking Place

As early as Saturday November 30, 2019, a new traffic configuration will be implemented at Rosemount Drive and Eglinton Avenue East to facilitate construction of the future surface stops and guideway. Westbound traffic will be shifted north of the work zone. Left turns will remain prohibited at the Rosemount Drive Intersection. There will be no north-south through traffic on Rosemount Drive. 

The new traffic configuration will be implemented as early as November 30, 2019

  Read more »

November 20 2019

Upcoming Crane and Building Delivery of TPSS 11 - Monday November 25 – Thursday November 28, 2019

 

What Work is Taking Place

The Traction Power Substation 11 (TPSS 11) building will be delivered to Scarborough Nissan on Monday November 25, 2019. The TPSS 11 will be delivered in three oversized loads. Vehicles carrying the loads will travel southbound on Warden Avenue and continue eastbound on Civic Road. 

Traffic will be temporarily stopped south of Civic Road in both directions to accommodate the delivery. Read more »