Utility Investigations for the Future Cedarvale Station
Looking for information related to a specific area?
Choose an intersection from the drop down list to view the latest news and construction updates. Intersections are listed alphabetically (with Eglinton as the main cross-street).
Choose an intersection (A to Z)
- Allen Road
- Avenue Road
- Bathurst Street
- Bayview Avenue
- Bermondsey Road
- Birchmount Road
- Black Creek Drive
- Brentcliffe Road
- Caledonia Road
- Chaplin Crescent
- Don Mills Road
- Donlea Drive/Hanna Road
- Don Valley Parkway (DVP)
- Dufferin Street
- Ferrand Drive
- Ionview Road
- Keele Street
- Kennedy Road
- Laird Drive
- Leslie Street
- Lebovic Avenue
- Little Blvd.
- Mount Pleasant Road
- Oakwood Avenue
- Petman Avenue
- Pharmacy Avenue
- Victoria Park Avenue
- Warden Avenue
- Weston Road
- Wynford Drive
- Yonge Street
April 14, 2016
What work is taking place?
- As part of the preparatory works for the future Cedarvale Station, pipe investigations of the existing storm and sanitary systems will be conducted in the vicinity of Eglinton Avenue West, Allen Road, Everden Road and Cedarvale Park
- Crews will enter existing manholes along the roadways/park areas and use cameras to observe the condition of sanitary and storm lines
- While all attempts will be made to limit noise, residents should expect some sound from construction vehicles
When:
- The work will take place over a period of five days, beginning as early as April 18, 2016
- The work on the roadways will take place overnight, between the hours of 10 p.m. and 6 a.m
Where:
- Crews will be present along Eglinton Avenue West between Park Hill Road and Allen Road Northbound, at Allen Road Southbound (50 m north of Eglinton Avenue West), at Everden Road (70 m south of Eglinton Avenue West) and in the Cedarvale Park area
Traffic Details:
- Temporary lane closures along Eglinton Avenue West between Allen Road North and Park Hill Road are expected at night time
- Pedestrian access will be maintained
- Paid duty officer will be onsite for traffic control
- As always, take care when travelling through construction sites
Please Contact Us
For more information, please contact Stas Ukhanov at crosstown@metrolinx.com or (416) 782-8118. We thank you for your continued patience as we work to build rapid transit.
Please support your local businesses during construction.
Categories: