Thank you to everyone who attended the open house or sent comments to us online.
Please review the Consultation Report [1] (PDF [1]) for Dufferin-Eglinton Station Preliminary Design Open House.
Next steps
- Construction work related to tunnelling and station box walls is scheduled to begin at Dufferin in late 2012/early 2013.
- The station itself will begin construction in 2014 (TBD).
Dufferin-Eglinton Station Preliminary Design
If you would like to view the presentation in full screen press the [2] in the bottom-right corner. If you cannot view the presentation below, read the text summary [3] or download the complete presentation [4] (PDF).